After the first season getting familiar with the boat we had a long list of things that we wanted to do to fix her up. We got a lot done in the spring. We repainted all of the red trim stripes and red railings black, repainted the fly bridge white, repainted the bottom and the swim platform, installed new carpet both inside and on the fly bridge, installed all new electronics, installed new curtains, repainted all of the walls inside, and powerwashed the bilge. The biggest job was removing the windows to tint them and install all new window tracks. Once it was all done the boat hardly resembled its old self. Check it out....




To see more pictures go the the gallery...
